Coast protection schemes - ongoing and completed
The major coastal defence scheme at West Bay has been completed. Phase 2 of the Lyme Regis Environmental Improvements scheme has commenced. Coast protection schemes have been completed at Ringstead, Seatown and Charmouth.
For details of the West Bay and Lyme Regis schemes please go to the appropriate page.
Completed schemes are as follows:
Ringstead Bay
The scheme comprised a new rock groyne together with a new slipway and beach replenishment. New cut off drains with improved stream and ditches were also constructed. The district council monitors the beach profile and will regrade or replenish the beach as necessary.
Seatown
The scheme comprised cliff drainage and rock armour placed against the existing soft cliffs.
Charmouth
The scheme comprised a new stepped sea wall and rock groyne.
If there are concerns about any of the above schemes please contact the Engineering Division.
-
Name: Engineering (West Dorset)
Email: engineers@westdorset-dc.gov.uk
Tel: 01305 252356
Fax: 01305 252349
Full details for Engineering (West Dorset)


Do more with this page
Do more with this site