Renewable Energy Consultation 2011
We are refreshing the Bournemouth, Dorset, and Poole Renewable Energy Strategy to bring it up to date and to put us on track for the future.
Renewable Energy Updated Strategy - Consultation draft (pdf, 123kb) (opens in a new window)
sets out a proposed strategy for the future. This document contains key questions and information on where to send consultation responses.
The public consultation period ran from 1 June until 30 September 2011 and has now concluded. The consultation responses received will be used to inform the final strategy. It is planned that an updated version of the strategy document will be produced for endorsement by key stakeholders before the end of the year.
The draft strategy was developed following a detailed analysis of the potential for renewable energy in the area, identification of key issues to be considered, a public opinion survey and a consultation event held in March 2011. Details of all of these stages and background documents to the strategy consultation document can be found below:
Summary of Stakeholder Consultation Event (pdf, 42kb) (opens in a new window)
and Bournemouth, Dorset and Poole Renewable Energy Strategy consultation event
August 2011 update
Some frequently asked questions are addressed in the attached document:
Renewable Energy Strategy FAQ's (pdf, 23kb) (opens in a new window) 
A technical update including a contribution from national renewable energy resources can be found in this document:
Renewable Energy Strategy technical update (pdf, 222kb) (opens in a new window) 


